Tuesday, January 27, 2009

Evaluation procedure of criterion of GRIHA, an Indian rating system

List of criteria
Points
Remarks

Criteria 1: Site Selection

1
Partly mandatory
Criteria 2: Preserve and protect landscape during construction /compensatory depository forestation.
5
Partly mandatory
Criteria 3: Soil conservation (post construction)
4

Criteria 4: Design to include existing site features
2
Mandatory
Criteria 5: Reduce hard paving on site
2
Partly mandatory
Criteria 6: Enhance outdoor lighting system efficiency
3

Criteria 7: Plan utilities efficiently and optimize on site circulation efficiency
3

Criteria 8: Provide, at least, minimum level of sanitation/safety facilities for construction workers
2
Mandatory
Criteria 9: Reduce air pollution during construction
2
Mandatory
Criteria 10: Reduce landscape water requirement
3

Criteria 11: Reduce building water use
2

Criteria 12: Efficient water use during construction
1

Criteria 13: Optimize building design to reduce conventional energy demand
6
Mandatory
Criteria 14: Optimize energy performance of building within specified comfort
12

Criteria 15: Utilization of flyash in building structure
6

Criteria 16: Reduce volume, weight and time of construction by adopting efficient technology (e.g. pre-cast systems, ready-mix concrete, etc.)
4

Criteria 17: Use low-energy material in interiors
4

Criteria 18: Renewable energy utilization
5

Criteria 19: Renewable energy based hot-water system
3

Criteria 20: Waste water treatment
2

Criteria 21: Water recycle and reuse (including rainwater)
5

Criteria 22: Reduction in waste during construction
2

Criteria 23: Efficient waste segregation
2

Criteria 24: Storage and disposal of waste
2

Criteria 25: Resource recovery from waste
2

Criteria 26: Use of low - VOC paints/ adhesives/ sealants.
4

Criteria 27: Minimize ozone depleting substances
3
Mandatory
Criteria 28: Ensure water quality
2
Mandatory
Criteria 29: Acceptable outdoor and indoor noise levels
2

Criteria 30: Tobacco and smoke control
1

Criteria 31: Universal Accessibility
1

Criteria 32: Energy audit and validation
Mandatory
Criteria 33: Operations and maintenance protocol for electrical and mechanical equipment
2
Mandatory
Total score 100
Criteria 34: Innovation (Beyond 100)
4

Total score
104

No comments: